Subfloor preparation and installation conditions
The performance of a timber floor depends heavily on the condition and construction of the subfloor beneath it. Before installation, the base should be dry, sound, clean and sufficiently level to support a consistent adhesive bond and stable finished floor.
Suspended timber floors and solid subfloors require different approaches. With a timber joist construction, the void beneath should remain adequately ventilated to help manage moisture. Existing boards must be secure, and a suitable moisture-control layer and plywood base may be required to create a stable, uniform surface for the flooring above.
On a solid construction, moisture protection below the screed is critical. The slab, damp-proof course, insulation and screed should form a properly designed build-up, with the screed thoroughly moisture-tested before any liquid damp-proof membrane, adhesive or timber flooring is applied.
Subfloor level is equally important. As a general guide, the surface should typically be within approximately ±3mm over a 2m span, subject to the flooring and adhesive manufacturer’s requirements. Uneven areas can lead to poor contact with the adhesive, hollow spots, movement and unnecessary stress within the boards.
Temperature and humidity should also be stable before, during and after installation. Good preparation helps prevent moisture ingress, supports dimensional stability and gives the flooring the best opportunity to perform well over the long term.